Show simple item record

dc.contributor.authorKebriyaii, Omid
dc.contributor.authorHeidari, Ali
dc.contributor.authorKhalilzadeh, Mohammad
dc.contributor.authorAntuchevičienė, Jurgita
dc.contributor.authorPavlovskis, Miroslavas
dc.date.accessioned2023-09-18T16:11:37Z
dc.date.available2023-09-18T16:11:37Z
dc.date.issued2021
dc.identifier.issn2073-8994
dc.identifier.other(crossref_id)132915729
dc.identifier.urihttps://etalpykla.vilniustech.lt/handle/123456789/112246
dc.description.abstractTime, cost, and quality have been known as the project iron triangles and substantial factors in construction projects. Several studies have been conducted on time-cost-quality trade-off problems so far, however, none of them has considered the time value of money. In this paper, a multi-objective mathematical programming model is developed for time-cost-quality trade-off scheduling problems in construction projects considering the time value of money, since the time value of money, which is decreased during a long period of time, is a very important matter. Three objective functions of time, cost, and quality are taken into consideration. The cost objective function includes holding cost and negative cash flows. In this model, the net present value (NPV) of negative cash flow is calculated considering the costs of non-renewable (consumable) and renewable resources in each time period of executing activities, which can be mentioned as the other contribution of this study. Then, three metaheuristic algorithms including multi-objective grey wolf optimizer (MOGWO), non-dominated sorting genetic algorithm (NSGA-II), and multi-objective particle swarm optimization (MOPSO) are applied, and their performance is evaluated using six metrics introduced in the literature. Finally, a bridge construction project is considered as a real case study. The findings show that considering the time value of money can prevent cost overrun in projects. Additionally, the results indicate that the MOGWO algorithm outperforms the NSGA-II and MOPSO algorithms.eng
dc.formatPDF
dc.format.extentp. 1-25
dc.format.mediumtekstas / txt
dc.language.isoeng
dc.relation.isreferencedbyScience Citation Index Expanded (Web of Science)
dc.relation.isreferencedbyScopus
dc.rightsLaisvai prieinamas internete
dc.source.urihttps://talpykla.elaba.lt/elaba-fedora/objects/elaba:114201618/datastreams/MAIN/content
dc.titleApplication of three metaheuristic algorithms to Time-Cost-Quality Trade-Off project scheduling problem for construction projects considering time value of money
dc.typeStraipsnis Web of Science DB / Article in Web of Science DB
dcterms.accessRightsThis article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https:// creativecommons.org/licenses/by/ 4.0/).
dcterms.licenseCreative Commons – Attribution – 4.0 International
dcterms.references64
dc.type.pubtypeS1 - Straipsnis Web of Science DB / Web of Science DB article
dc.contributor.institutionIran University of Science and Technology
dc.contributor.institutionPontificia Universidad Católica del Perú
dc.contributor.institutionVilniaus Gedimino technikos universitetas
dc.contributor.facultyStatybos fakultetas / Faculty of Civil Engineering
dc.subject.researchfieldT 002 - Statybos inžinerija / Construction and engineering
dc.subject.researchfieldT 007 - Informatikos inžinerija / Informatics engineering
dc.subject.vgtuprioritizedfieldsSD0202 - Aplinką tausojančios statybinės medžiagos ir technologijos / Low emissions building materials and technologies
dc.subject.ltspecializationsL104 - Nauji gamybos procesai, medžiagos ir technologijos / New production processes, materials and technologies
dc.subject.enproject scheduling
dc.subject.entime-cost-quality trade-off
dc.subject.endiscounted cash flow
dc.subject.enMOGWO
dc.subject.enNSGA-II
dc.subject.enMOPSO
dc.subject.enmetaheuristic algorithm
dcterms.sourcetitleSymmetry: Symmetric and asymmetric data in solution models, part II
dc.description.issueiss. 12
dc.description.volumevol. 13
dc.publisher.nameMDPI
dc.publisher.cityBasel
dc.identifier.doi132915729
dc.identifier.doi000742399400001
dc.identifier.doi10.3390/sym13122402
dc.identifier.elaba114201618


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record