Rodyti trumpą aprašą

dc.contributor.authorKhanzadi, Mostafa
dc.contributor.authorTurskis, Zenonas
dc.contributor.authorGhodrati Amiri, Gholamreza
dc.contributor.authorChalekaee, Alireza
dc.date.accessioned2023-09-18T16:53:21Z
dc.date.available2023-09-18T16:53:21Z
dc.date.issued2017
dc.identifier.issn1392-3730
dc.identifier.urihttps://etalpykla.vilniustech.lt/handle/123456789/117768
dc.description.abstractConflict between parties is a common issue in construction projects. In the present article, the conflicts between contractor and employer in delayed Design-Bid-Build projects have been studied. Defining a case study, a dispute resolution method has been proposed. This case has been considered as a MCDM problem. This problem has been assumed as a discrete zero-sum two-person matrix game with grey numbers. Among the four alternatives available for contractor and employer in the proposed case study, termination is the last alternative that decision makers choose. Based on different risk values, authors determined the optimal solution for both parties. This article integrates some linguistic criteria together with time and cost, providing the better conditions to avoid lengthy bargaining.eng
dc.formatPDF
dc.format.extentp. 824-835
dc.format.mediumtekstas / txt
dc.language.isoeng
dc.relation.isreferencedbyScopus
dc.relation.isreferencedbyAcademic Search Complete
dc.relation.isreferencedbyScience Citation Index Expanded (Web of Science)
dc.source.urihttp://dx.doi.org/10.3846/13923730.2017.1323005
dc.subjectSD04 - Tvarus statinių gyvavimo ciklas / Sustainable lifecycle of the buildings
dc.titleA model of discrete zero-sum two-person matrix games with grey numbers to solve dispute resolution problems in construction
dc.typeStraipsnis Web of Science DB / Article in Web of Science DB
dcterms.references77
dc.type.pubtypeS1 - Straipsnis Web of Science DB / Web of Science DB article
dc.contributor.institutionIran University of Science & Technology
dc.contributor.institutionVilniaus Gedimino technikos universitetas
dc.contributor.facultyStatybos fakultetas / Faculty of Civil Engineering
dc.contributor.departmentIšmaniųjų pastatų technologijų mokslo institutas / Research Institute of Smart Building Technologies
dc.subject.researchfieldT 002 - Statybos inžinerija / Construction and engineering
dc.subject.researchfieldS 004 - Ekonomika / Economics
dc.subject.ltspecializationsL103 - Įtrauki ir kūrybinga visuomenė / Inclusive and creative society
dc.subject.enMCDM
dc.subject.enConstruction delay
dc.subject.enDispute resolution
dc.subject.enGame theory
dc.subject.enADR
dc.subject.enGrey number
dcterms.sourcetitleJournal of civil engineering and management
dc.description.issueiss. 6
dc.description.volumeVol. 23
dc.publisher.nameTechnika ; Taylor & Francis
dc.publisher.cityVilnius ; London
dc.identifier.doi000404258300013
dc.identifier.doi10.3846/13923730.2017.1323005
dc.identifier.elaba23184329


Šio įrašo failai

FailaiDydisFormatasPeržiūra

Su šiuo įrašu susijusių failų nėra.

Šis įrašas yra šioje (-se) kolekcijoje (-ose)

Rodyti trumpą aprašą