Show simple item record

dc.contributor.authorReizgevičiūtė, Laura
dc.contributor.authorReizgevičius, Marius
dc.contributor.authorUstinovičius, Leonas
dc.contributor.authorPelikša, Mykolas
dc.date.accessioned2023-09-18T17:47:26Z
dc.date.available2023-09-18T17:47:26Z
dc.date.issued2013
dc.identifier.issn1648-7974
dc.identifier.other(BIS)SUB02-000009976
dc.identifier.urihttps://etalpykla.vilniustech.lt/handle/123456789/125973
dc.description.abstractBIM (Building Information Modeling) projektavimas labai dažnai analizuojama sritis statybos inžinerijos ir vadybos moksliniuose leidiniuose. Užsienio autoriai pabrėžia pastato informacinio modelio panaudojimo galimybių svarbą statybos pramonėje. Projektuojama braižant ne linijomis, o jau elementais, kurie turi savo parametrus. BIM susieja į vairius pastato statybos proceso vykdymui, statiniui turinčius įtakos veiksnius: laiką, sąnaudas, apšvietimą , geografinę padėtį, statybos medžiagas, jų kiekius, kt. Straipsnyje aptariami pastato informacinio modeliavimo privalumai ir trūkumai. Vienas didžiausių BIM privalumų – tai lengvas klaidų šalinimas – visa informacija kaupiama viename modelyje, atsiradus klaidai, ją ištaisyti paprasta ir pakanka tai padaryti vienoje vietoje. Kita vertus, maža tikimybė , kad visi projekto dalyviai naudosis viena projektavimo sistema, nes dažniausiai tai ne vienos įmonė s darbas. Be to, BIM programos sud ėtingos ir labai apkrautos. Įvertinus visus kriterijus, aptariama įtaka darbo efektyvumui, kaip privalumai gali pagreitinti darbą . BIM technologijų įtakos darbo efektyvumo vertinimui buvo pasirinkti 100 daugiaaukščių pastatų (dangoraižių). Skaič iavimai parodo, kad pastato informacinis modelis ne visada pagreitina statyb ų procesą. Pastatai, statyti dar nenaudojant BIM buvo statyti greičiau nei pradėjus naudoti pastato informacinį modelį. BIM yra reikalingas projektavime, kai kuriamas pilnas kompleksinis projektas. Naudojant pastato informacinį modelį tik atskiroms dalims, nenaudojant centrinio failo, gaištamas laikas keičiant programų formatus, dažnai net perbraižant brėžinius.lit
dc.description.abstractBIM (Building Information Modeling) is very often analyzed area in scientific articles of construction engineering and management. Foreign authors emphasize the importance of the Building Information Model for the construction industry. Designing with BIM means to create elements that have their own settings, not drawing seperate lines. BIM connects various building construction influencing factors: time, cost, lighting, geographical location, building materials, quantities, etc. This article discusses the building in formation modeling advantages and disadvantages. One of the biggest advantage of BIM is an easy error-disposal, because all information is stored in one model, and when an error occurs, it is easy to correct the mistake, and it is sufficient to do it in one place. On the other hand, there is a small probability that all project‘s participants will use one design system, because usually it is not one company‘s work. In addition, the BIM programs are complicated and highly loaded. When all criteria is analyzed, BIM technologies influence for job efficiency is discussed. 100 multi-storey buildings (skyscrapers) were selected to evaluate the efficiency. Calculations show that Building Information Modeling not always speeds up the construction process. Buildings that were constructed without using BIM were built faster than buildings in which BIM was used. BIM is required for design when there will be made a fully integrated project. Using the Building Information Model for the individual parts of the project without the use of the central file, there is a possibility to waste time for changing program formats, often even redrawing the drawings.eng
dc.format.extentp. 143-148
dc.format.mediumtekstas / txt
dc.language.isolit
dc.relation.isreferencedbyC.E.E.O.L
dc.relation.isreferencedbyIndex Copernicus
dc.relation.isreferencedbyBusiness Source Complete
dc.subjectSD01 - Architektūra, urbanistika, kraštovaizdžio architektūra, teritorijų planavimas / Architecture, urban planning, landscape architecture and regional planning
dc.titleBIM technologijų įtaka darbo efektyvumui
dc.title.alternativeBIM technologies influence for job efficiency
dc.typeStraipsnis kitoje DB / Article in other DB
dcterms.references16
dc.type.pubtypeS3 - Straipsnis kitoje DB / Article in other DB
dc.contributor.institutionŠiaulių universitetas
dc.contributor.institutionŠiaulių universitetas Vilniaus Gedimino technikos universitetas
dc.contributor.institutionVilniaus Gedimino technikos universitetas
dc.contributor.facultyPersonalo direkcija / Human Resources Office
dc.contributor.facultyStatybos fakultetas / Faculty of Civil Engineering
dc.subject.researchfieldT 002 - Statybos inžinerija / Construction and engineering
dc.subject.ltspecializationsL104 - Nauji gamybos procesai, medžiagos ir technologijos / New production processes, materials and technologies
dc.subject.ltBIM
dc.subject.lt4D CAD
dc.subject.ltefektyvumas
dc.subject.lt3D CAD
dc.subject.lt2D CAD
dc.subject.enBIM
dc.subject.en4D CAD
dc.subject.enefficiency
dc.subject.en3D CAD
dc.subject.en2D CAD
dcterms.sourcetitleVadyba = Journal of management
dc.description.issueNr. 1
dc.publisher.nameKlaipėdos universiteto leidykla
dc.publisher.cityKlaipėda
dc.identifier.elaba3519356


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record