Show simple item record

dc.contributor.authorLepkova, Natalija
dc.contributor.authorMaya, Rana
dc.contributor.authorAhmed, Sonia
dc.contributor.authorŠarka, Vaidotas
dc.date.accessioned2023-09-18T18:50:56Z
dc.date.available2023-09-18T18:50:56Z
dc.date.issued2019
dc.identifier.issn2571-1075
dc.identifier.urihttps://etalpykla.vilniustech.lt/handle/123456789/132616
dc.description.abstractRecently, Building information modelling (BIM) proves its capability to solve the raised AEC industry issues. Therefore, several countries and entities pursue to transform into BIM especially the developed countries. Lithuania as a European country has a great challenge to cap up with the surrounding environment to implement BIM. This study aims to determine the BIM maturity levels in Lithuania and supposed the missed steps to upgrade to the next level. Eighteen important Lithuanian construction projects awarded the most successful implementing BIM are chosen as a case study. Face-to-face interviews were conducted with several BIM experts whose work at the chosen projects. The analysis conducted by the most effective theoretical model entitled BIM Maturity Matrix (BIMM). The key findings of this research that Lithuania reached the BIM implementing maturity level 2 while some projects still at level 1 that proves the ability of Lithuanian AEC industry to softly and completely transfer the maturity to level 2 by the recommendation provided through the proposed approach at the end of the paper. These results provide a stunning opportunity to improve the AEC project performance and reap the benefits of implementing BIM. Future studies can develop a framework to improve the BIM implementation in Lithuania softly.eng
dc.format.extentp. 22-38
dc.format.mediumtekstas / txt
dc.language.isoeng
dc.source.urihttps://drive.google.com/file/d/1DVUHlib2ZClMvfsBybVkMNKSXEk-F7UI/view
dc.titleBIM implementation maturity level and proposed approach for the upgrade in Lithuania
dc.typeStraipsnis kitame recenzuotame leidinyje / Article in other peer-reviewed source
dcterms.references36
dc.type.pubtypeS4 - Straipsnis kitame recenzuotame leidinyje / Article in other peer-reviewed publication
dc.contributor.institutionVilniaus Gedimino technikos universitetas
dc.contributor.institutionTishreen University
dc.contributor.institutionBIMarabia
dc.contributor.facultyStatybos fakultetas / Faculty of Civil Engineering
dc.contributor.facultyFundamentinių mokslų fakultetas / Faculty of Fundamental Sciences
dc.subject.researchfieldT 002 - Statybos inžinerija / Construction and engineering
dc.subject.vgtuprioritizedfieldsSD0404 - Statinių skaitmeninis modeliavimas ir tvarus gyvavimo ciklas / BIM and Sustainable lifecycle of the structures
dc.subject.ltspecializationsL104 - Nauji gamybos procesai, medžiagos ir technologijos / New production processes, materials and technologies
dc.subject.enBIM
dc.subject.enBIM maturity model
dc.subject.enBIM stages
dc.subject.enimplementation maturity
dcterms.sourcetitleInternational journal of BIM and engineering science
dc.description.issueiss. 1
dc.description.volumevol. 2
dc.publisher.nameBIMarabia
dc.identifier.elaba39608825


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record