dc.description.abstractTraditional construction planning is being replaced by the building information modelling (BIM) approach, which seeks to digitalise all the construction procedures, including procurement. Successful implementation of BIM on the market requires the preparation of appropriate procurement documents. Purpose – to suggest the most suitable set of documents for public procurement in the context of BIM by analysing the documents that are necessary for implementing the stages of the building life cycle. Research methodology – in order to achieve the aim of the research, the in-depth analysis of different countries’ procurement methodological documents and analysis of the scientific articles have been implemented. The methodology also includes expert interviewing, which was done in order to analyse the investigated standards. Findings – After analysing the procurement procedures of Norway, Spain, France, Poland, the United Kingdom, the Netherlands, and Finland, a set of documents, including Employer’s Information Requirements (EIR), BIM Execution Plan (BEP) and BIM protocol, was considered as the most suitable for BIM-based procurement processes. In addition, the basic principles of ISO 19650-2:2018 do not reflect the specific conditions of each country, so it is appropriate to examine the possibility of providing guidance in individual national annexes that reflects the peculiarities of national procurement. Research limitations – some research limitations were related to the challenges to access the literature, particularly the regulatory documentation associated with the public procurement procedure in a singular Country. Also, the difficulties with and accessing the document in the English language. However, in most of these cases, the document overview was analysed or translated from the native language. Originality/Value – existing related studies are mainly oriented on a particular region/country, and no general overview of European countries regarding BIM procurement procedures has been implemented. Additionally, a significant scientific contribution of this research is the review of the fundamental standards, which includes the general specification for information management in construction projects using BIM. Implemented analysis can serve as a basis for other authors to implement their research concerning their region, to suggest the most appropriate and suitable set of documents. Practical implications – this study contributes to the preparation of the Lithuanian market for the implementation of BIM and could help policy-makers to prepare the most appropriate procurement documents.eng
dc.formatPDF
dc.format.extentp. 180-197
dc.format.mediumtekstas / txt
dc.language.isoeng
dc.relation.isreferencedbyEmerging Sources Citation Index (Web of Science)
dc.relation.isreferencedbyScopus
dc.relation.isreferencedbyProQuest Central
dc.relation.isreferencedbyGale's Academic OneFile
dc.rightsLaisvai prieinamas internete
dc.source.urihttps://journals.vgtu.lt/index.php/BME/article/view/14653/10623
dc.source.urihttps://talpykla.elaba.lt/elaba-fedora/objects/elaba:98907817/datastreams/MAIN/content
dc.titleBuilding information modelling: procurement procedure
dc.typeStraipsnis Web of Science DB / Article in Web of Science DB
dcterms.accessRightsThis is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0/) which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
dcterms.licenseCreative Commons – Attribution – 4.0 International
dcterms.references59
dc.type.pubtypeS1 - Straipsnis Web of Science DB / Web of Science DB article
dc.contributor.institutionVilniaus Gedimino technikos universitetas
dc.contributor.facultyStatybos fakultetas / Faculty of Civil Engineering
dc.contributor.facultyVerslo vadybos fakultetas / Faculty of Business Management
dc.subject.researchfieldT 002 - Statybos inžinerija / Construction and engineering
dc.subject.researchfieldS 004 - Ekonomika / Economics
dc.subject.researchfieldS 003 - Vadyba / Management
dc.subject.vgtuprioritizedfieldsSD0404 - Statinių skaitmeninis modeliavimas ir tvarus gyvavimo ciklas / BIM and Sustainable lifecycle of the structures
dc.subject.ltspecializationsL102 - Energetika ir tvari aplinka / Energy and a sustainable environment
dc.subject.enbuilding information modelling (BIM)
dc.subject.enBIM standards
dc.subject.enEmployer’s Information Requirements (EIR)
dc.subject.enBIM Execution Plan (BEP)
dc.subject.enpublic procurement
dcterms.sourcetitleBusiness, management and economics engineering
dc.description.issueiss. 1
dc.description.volumevol. 19
dc.publisher.nameVilnius Gediminas Technical University
dc.publisher.cityVilnius
dc.identifier.doi000667950700001
dc.identifier.doi10.3846/bmee.2021.14653
dc.identifier.elaba98907817


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record