• Lietuvių
    • English
  • Lietuvių 
    • Lietuvių
    • English
  • Prisijungti
Peržiūrėti įrašą 
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • Peržiūrėti įrašą
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • Peržiūrėti įrašą
JavaScript is disabled for your browser. Some features of this site may not work without it.

Small hydro-power plant project selection using fuzzy axiomatic design principles

Thumbnail
Data
2015
Autorius
Khandekar, Anant V.
Antuchevičienė, Jurgita
Chakraborty, Shankar
Metaduomenys
Rodyti detalų aprašą
Santrauka
There has been a rapid growth in construction activities during the last few decades owing to overall development in all facets of humanity. Due to technological advancements and ever increasing civilization, there is a persistent need of energy. Along with the conventional energy sources, the renewable energy sources have also significantly contributed to the rising energy needs. As a renewable source of energy, numerous small hydro-power plants (SHPPs) have been built up across the world in the recent past. Usually these SHPPs are being built and operated by the private developers complying with the government regulations. In order to assist a developer in selecting the most profitable and feasible SHPP for construction and subsequent operation, a method based on fuzzy axiomatic design principles is employed in this paper. The techno-commercial and socio- economic criteria as considered for analyzing the feasibility of the candidate SHPPs are expressed qualitatively using trapezoidal fuzzy numbers. The performance of each SHPP is evaluated in terms of its total information content and the one with the least information content is selected to be the best venture for the required construction activity. The adopted methodology is found to have immense potential to the developers while selecting the most feasible project for construction.
Paskelbimo data (metai)
2015
URI
https://etalpykla.vilniustech.lt/handle/123456789/112666
Kolekcijos
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources [7946]

 

 

Naršyti

Visame DSpaceRinkiniai ir kolekcijosPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijosŠi kolekcijaPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijos

Asmeninė paskyra

PrisijungtiRegistruotis