• Lietuvių
    • English
  • English 
    • Lietuvių
    • English
  • Login
View Item 
  •   DSpace Home
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • View Item
  •   DSpace Home
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Evaluation of infrastructure projects by a decision model based on RPR, MABAC, and WASPAS methods with interval-valued intuitionistic fuzzy sets

Thumbnail
View/Open
16476-Article Text-61527-2-10-20220222.pdf (850.9Kb)
Date
2022
Author
Salimian, Sina
Mousavi, Seyed Meysam
Antuchevičienė, Jurgita
Metadata
Show full item record
Abstract
Infrastructure projects (IPs) face numerous challenges to reach the predefined aims over their life-cycle. There are many difficulties in projects because of the variety of elements in project’s tendency and the dependency of the project on mainly national factors. Due to these difficulties and their practices, the projects meet with uncertainty. In this paper, an interval-valued intuitionistic fuzzy set (IVIFS) is used at identifying ambiguity in IPs. Also, a new multi-criteria decision-making (MCDM) model is presented to evaluate and select the suitable alternative in IPs. Hence, a new IVIF-relative preference alternative-multi-attributive border approximation area comparison (IVIF-RPR-MABAC), and IVIF-weighted aggregated sum product assessment (IVIF-WASPAS) are proposed in order to obtain the weights of decision makers (DMs) and criteria, and a new IVIF-RPR-MABAC method is proposed to rank the alternatives. In this paper, a combination of the three mentioned approaches creates proposed new hybrid model to evaluate the main factors and the projects. Furthermore, a real case study is applied from the literature to validate the efficiency and performance of the proposed model. Afterward, a comparative analysis is presented to validate the proposed approach by comparing the hybrid proposed model with two IVIF-TOPSIS and IVIF-extended-VIKOR methods. The final results confirm the efficiency of the proposed model in ranking the main alternatives of an MCDM problem. Moreover, the sensitivity analysis is reported to determine the affection of parameters on the final weighting and ranking outcomes.
Issue date (year)
2022
URI
https://etalpykla.vilniustech.lt/handle/123456789/112810
Collections
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources [7946]

 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjects / KeywordsInstitutionFacultyDepartment / InstituteTypeSourcePublisherType (PDB/ETD)Research fieldStudy directionVILNIUS TECH research priorities and topicsLithuanian intelligent specializationThis CollectionBy Issue DateAuthorsTitlesSubjects / KeywordsInstitutionFacultyDepartment / InstituteTypeSourcePublisherType (PDB/ETD)Research fieldStudy directionVILNIUS TECH research priorities and topicsLithuanian intelligent specialization

My Account

LoginRegister