• Lietuvių
    • English
  • English 
    • Lietuvių
    • English
  • Login
View Item 
  •   DSpace Home
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • View Item
  •   DSpace Home
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Influence of track geometry condition monitoring on railway infrastructure maintenance processing

Thumbnail
View/Open
Bureika.pdf (411.2Kb)
Date
2022
Author
Bureika, Gintautas
Vaičiūnas, Gediminas
Shi, Dachuan
Zanuy, Armando Carrillo
Metadata
Show full item record
Abstract
This study analyzed the usage of data of track geometry measurement for railway infrastructure maintenance processing support and estimated its influence on railway infrastructure maintenance decision-making. Especially, the approach assessment of the influence of track geometry monitoring on railway infrastructure processing. The well-timed maintenance of the arrangement of railway tracks in allowable conditions is sufficient for the smooth and steady running of rail vehicles. The mechanism of track gauge widening during exploitation is usually gradual and relatively long-lasting. When are not detected in a timely manner, the final track failures often arise under the effect of additional factors, such as surpassed train speed limit, poorly maintained and functioning running gear of a rail vehicle, misalignment of rails, and extreme dynamical effects. A questionnaire considering the influence of the application of track geometry monitoring was formulated. An expert review was completed in order to perform a comparative analysis of the features of track geometry monitoring with the greatest influence on railway infrastructure maintenance processing. The data collected from respondents were processed using a multi-criterion estimation method, especially an interactive fuzzy linear assignment method. Finally, basic conclusions and considerations are given.
Issue date (year)
2022
URI
https://etalpykla.vilniustech.lt/handle/123456789/113903
Collections
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources [7946]

 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjects / KeywordsInstitutionFacultyDepartment / InstituteTypeSourcePublisherType (PDB/ETD)Research fieldStudy directionVILNIUS TECH research priorities and topicsLithuanian intelligent specializationThis CollectionBy Issue DateAuthorsTitlesSubjects / KeywordsInstitutionFacultyDepartment / InstituteTypeSourcePublisherType (PDB/ETD)Research fieldStudy directionVILNIUS TECH research priorities and topicsLithuanian intelligent specialization

My Account

LoginRegister