| dc.contributor.author | Bureika, Gintautas | |
| dc.date.accessioned | 2023-09-18T16:35:35Z | |
| dc.date.available | 2023-09-18T16:35:35Z | |
| dc.date.issued | 2023 | |
| dc.identifier.issn | 2523-3440 | |
| dc.identifier.uri | https://etalpykla.vilniustech.lt/handle/123456789/115287 | |
| dc.description.abstract | The problematic of determination of maximum capacity of Lithuanian Railway lines is considered is this article. Maximum capacity considered the largest number of trains that could run over a railway line, during the scheduled time interval. At the same time, the train traffic should be ensured in a strictly perfect, mathematically defined environment, with the trains running permanently and ideally at minimum headway, i.e., keeping time-based distance between two consecutive trains. Current applied calculation methods and the means of Lithuanian train traffic arranging are revised by estimating the railway traffic irregularity due the features of technical equipment: traction vehicles, signalling, automatic, track, catenary, etc. The maximum potential capacities of three problematic lines of Lithuanian Railways are estimated taking into account the type and power of freight locomotives. Considered railway lines are: “Livintai - Gaižiūnai”, “Plungė - Šateikiai” and “Pagėgiai - Tauragė - Viduklė”. Finally, basic conclusions and recommendations are given. | eng |
| dc.format | PDF | |
| dc.format.extent | p. 756-764 | |
| dc.format.medium | tekstas / txt | |
| dc.language.iso | eng | |
| dc.relation.ispartofseries | Lecture Notes in Intelligent Transportation and Infrastructure 2523-3440 2523-3459 | |
| dc.relation.isreferencedby | SpringerLink | |
| dc.rights | Prieinamas tik institucijos intranete | |
| dc.source.uri | https://link.springer.com/chapter/10.1007/978-3-031-25863-3_73 | |
| dc.source.uri | https://talpykla.elaba.lt/elaba-fedora/objects/elaba:156849477/datastreams/MAIN/content | |
| dc.source.uri | https://talpykla.elaba.lt/elaba-fedora/objects/elaba:156849477/datastreams/COVER/content | |
| dc.title | Revised estimation of public railway infrastructure line capacity: Lithuanian case | |
| dc.type | Straipsnis konferencijos darbų leidinyje kitoje DB / Paper in conference publication in other DB | |
| dcterms.references | 10 | |
| dc.type.pubtype | P1c - Straipsnis konferencijos darbų leidinyje kitoje DB / Article in conference proceedings in other DB | |
| dc.contributor.institution | Vilniaus Gedimino technikos universitetas | |
| dc.contributor.faculty | Transporto inžinerijos fakultetas / Faculty of Transport Engineering | |
| dc.subject.researchfield | T 003 - Transporto inžinerija / Transport engineering | |
| dc.subject.studydirection | E12 - Transporto inžinerija / Transport engineering | |
| dc.subject.vgtuprioritizedfields | TD0404 - Eismo saugos technologijos / Traffic safety technologies | |
| dc.subject.ltspecializations | L106 - Transportas, logistika ir informacinės ir ryšių technologijos (IRT) / Transport, logistic and information and communication technologies | |
| dc.subject.en | railway transport | |
| dc.subject.en | line capacity | |
| dc.subject.en | traffic schedule | |
| dc.subject.en | period | |
| dc.subject.en | time interval | |
| dc.subject.en | consecutive trains | |
| dcterms.sourcetitle | TRANSBALTICA XIII: Transportation Science and Technology. Proceedings of the 13th International Conference TRANSBALTICA, September 15-16, 2022, Vilnius, Lithuania | |
| dc.publisher.name | Springer | |
| dc.publisher.city | Cham | |
| dc.identifier.doi | 10.1007/978-3-031-25863-3_73 | |
| dc.identifier.elaba | 156849477 | |