Show simple item record

dc.contributor.authorBirvydienė, Rosita
dc.contributor.authorButkus, Algirdas
dc.contributor.authorBūga, Arūnas
dc.contributor.authorDedela, Ramūnas
dc.contributor.authorKolosovskis, Ričardas
dc.contributor.authorKrikštaponis, Boleslovas
dc.contributor.authorMusteikis, Arvydas
dc.contributor.authorNeseckas, Algirdas
dc.contributor.authorObuchovski, Romuald
dc.contributor.authorParšeliūnas, Eimuntas Kazimieras
dc.contributor.authorPetniūnas, Marius
dc.contributor.authorPetroškevičius, Petras
dc.contributor.authorPuškorius, Vytautas
dc.contributor.authorPutrimas, Raimundas
dc.contributor.authorSkuodis, Gediminas
dc.contributor.authorStepanovienė, Jadvyga
dc.contributor.authorŠlikas, Dominykas
dc.contributor.authorŠorys, Tautvydas
dc.contributor.authorTumelienė, Eglė
dc.contributor.authorValotka, Simonas
dc.contributor.authorViskontas, Povilas
dc.contributor.authorZigmantienė, Evelina
dc.date.accessioned2023-09-18T17:01:12Z
dc.date.available2023-09-18T17:01:12Z
dc.date.issued2017
dc.identifier.urihttps://etalpykla.vilniustech.lt/handle/123456789/118999
dc.description.abstractThe methodology of all kinds of geodetic measurements of the Geodetic Vertical Second Order Network, the information on the observation data received and main results of the accuracy estimation and adjustment of the network are presented. In 2006 the development of the Geodetic Vertical First Order Network of Lithuania was completed. It was the basis to adopt the Height System of Lithuania (LAS07). The densification of the Geodetic Vertical First Order Network started in 2010 by development of the Geodetic Vertical Second Order Network. The Second Order Network consists of 74 levelling lines, and total length of them is 3087 km. In the period of 2010–2013 the 16 levelling lines (814 km) were observed. Rest of levelling lines were observed in 2013–2016. Total number of benchmarks is 2099. The levelling was executed by digital levels Trimble DiNi12 and coded rods Nedo LD13. All ground benchmarks were positioned by GPS receivers Trimble 5700 and Trimble Zephyr Geodetic antennas. LitPOS stations served as fiducial points. The gravity accelerations at all benchmarks were observed by gravimeters Scintrex CG-5. The levellings of the Second Order Network carried out is characterized by high precision: the double run of one kilometre levelling RMS error does not exceeds 0.7 mm. The adjustments of the second order levelling lines applying least square method were executed separately in each region outlined by the First Order network lines and border of a country.eng
dc.formatPDF
dc.format.extentp. 1-10
dc.format.mediumtekstas / txt
dc.language.isoeng
dc.relation.isreferencedbyConference Proceedings Citation Index - Science (Web of Science)
dc.relation.isreferencedbyScopus
dc.rightsLaisvai prieinamas internete
dc.source.urihttps://doi.org/10.3846/enviro.2017.166
dc.source.urihttp://enviro.vgtu.lt/index.php/enviro/2017/paper/viewFile/586/451
dc.source.urihttps://talpykla.elaba.lt/elaba-fedora/objects/elaba:24524044/datastreams/MAIN/content
dc.subjectAE01 - Aplinkos sistemos ir aplinkos apsaugos technologijos / Environmental systems and environment protection technologies
dc.titleFinal results of establishment of the geodetic vertical second order network of Lithuania
dc.typeStraipsnis konferencijos darbų leidinyje Web of Science DB / Paper in conference publication in Web of Science DB
dcterms.accessRightsThis is an open-access article distributed under the terms of the Creative Commons Attribution (CC BY-NC 4.0) License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
dcterms.licenseCreative Commons – Attribution – NonCommercial – 4.0 International
dcterms.references26
dc.type.pubtypeP1a - Straipsnis konferencijos darbų leidinyje Web of Science DB / Article in conference proceedings Web of Science DB
dc.contributor.institutionVilniaus Gedimino technikos universitetas
dc.contributor.facultyAplinkos inžinerijos fakultetas / Faculty of Environmental Engineering
dc.subject.researchfieldT 010 - Matavimų inžinerija / Measurement engineering
dc.subject.researchfieldT 004 - Aplinkos inžinerija / Environmental engineering
dc.subject.ltspecializationsL102 - Energetika ir tvari aplinka / Energy and a sustainable environment
dc.subject.enLevelling
dc.subject.enDigital level
dc.subject.enVertical network
dc.subject.enHeight system
dcterms.sourcetitle10th International conference "Environmental Engineering", 27-28 April 2017, Vilnius Gediminas Technical University, Lithuania
dc.publisher.nameVGTU Press
dc.publisher.cityVilnius
dc.identifier.doi2-s2.0-85061771236
dc.identifier.doi000495878500246
dc.identifier.doi10.3846/enviro.2017.166
dc.identifier.elaba24524044


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record