| dc.contributor.author | Pavlovskis, Miroslavas | |
| dc.contributor.author | Migilinskas, Darius | |
| dc.contributor.author | Antuchevičienė, Jurgita | |
| dc.contributor.author | Urba, Irina | |
| dc.contributor.author | Zigmund, Viačeslav | |
| dc.date.accessioned | 2023-09-18T17:03:01Z | |
| dc.date.available | 2023-09-18T17:03:01Z | |
| dc.date.issued | 2017 | |
| dc.identifier.issn | 1877-7058 | |
| dc.identifier.uri | https://etalpykla.vilniustech.lt/handle/123456789/119307 | |
| dc.description.abstract | The research deals with reconstruction projects investigation by applying statistical analysis and multiple criteria decision-making method, also research on application of Building Information Modelling (BIM) methodology for reconstruction projects. The implementation of reconstruction projects face a lot of problems, and the list of problems is identified when analyzing Lithuanian case studies. The analysis shows that it is necessary to monitor design, construction and maintenance stages both for quality control and information management during the whole project life cycle. According to suggested problem recognition methodology, the list of problems is analyzed in terms of occurrence in the projects and influence to the project. The complex solution is based on estimated problems significance as a result of statistical survey and expert survey by applying Analytic Hierarchy Process (AHP) methodology. Possible BIM uses for reconstruction projects are suggested to prevent the identified problems. | eng |
| dc.format | PDF | |
| dc.format.extent | p. 125-128 | |
| dc.format.medium | tekstas / txt | |
| dc.language.iso | eng | |
| dc.relation.isreferencedby | Conference Proceedings Citation Index - Science (Web of Science) | |
| dc.relation.isreferencedby | Scopus | |
| dc.relation.isreferencedby | ScienceDirect | |
| dc.source.uri | https://doi.org/10.1016/j.proeng.2017.11.029 | |
| dc.subject | SD04 - Tvarus statinių gyvavimo ciklas / Sustainable lifecycle of the buildings | |
| dc.title | Problems in reconstruction projects, BIM uses and decision-making: Lithuanian case studies | |
| dc.type | Straipsnis konferencijos darbų leidinyje Web of Science DB / Paper in conference publication in Web of Science DB | |
| dcterms.references | 8 | |
| dc.type.pubtype | P1a - Straipsnis konferencijos darbų leidinyje Web of Science DB / Article in conference proceedings Web of Science DB | |
| dc.contributor.institution | Vilniaus Gedimino technikos universitetas | |
| dc.contributor.faculty | Statybos fakultetas / Faculty of Civil Engineering | |
| dc.subject.researchfield | T 002 - Statybos inžinerija / Construction and engineering | |
| dc.subject.ltspecializations | L104 - Nauji gamybos procesai, medžiagos ir technologijos / New production processes, materials and technologies | |
| dc.subject.en | Reconstruction projects | |
| dc.subject.en | Building information modelling | |
| dc.subject.en | BIM uses | |
| dc.subject.en | Decision-making | |
| dcterms.sourcetitle | Procedia Engineering. 2nd International Joint Conference on Innovative Solutions in Construction Engineering and Management: 16th Lithuanian -German -Polish colloquium and 6th meeting of EURO working group Operational Research in Sustainable Development and Civil Engineering 24 May- 2nd International Workshop on flexibility in sustainable construction, ORSDCE 2017, 24 -26 April 2017, Poznan-Puszczykowo, Poland | |
| dc.description.volume | Vol. 208 | |
| dc.publisher.name | Elsevier | |
| dc.publisher.city | Amsterdam | |
| dc.identifier.doi | 000426267100017 | |
| dc.identifier.doi | 2-s2.0-85040253011 | |
| dc.identifier.doi | 10.1016/j.proeng.2017.11.029 | |
| dc.identifier.elaba | 24860380 | |