• Lietuvių
    • English
  • English 
    • Lietuvių
    • English
  • Login
View Item 
  •   DSpace Home
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • View Item
  •   DSpace Home
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Challenges of BIM technology application in project planning

Thumbnail
Date
2018
Author
Ustinovičius, Leonas
Puzinas, Arūnas
Starynina, Jovita
Vaišnoras, Mantas
Černiavskaja, Oksana
Kontrimovičius, Robertas
Metadata
Show full item record
Abstract
The study aimes at identification of the difficulties in choosing the correct concept of the main building process. The use of a proper BIM design may help the user avoid mistakes and make the building process faster as well as less financial resource intensive. The authors focused on literature review, analysing the difficulties of the BIM design software technology in construction project planning. The biggest flaws in BIM design are inherent in three building process stages: 1) the preparation of a building investment project, and the analysis of the existing situation; 2) the preparation of the building execution technology project; 3) the existing standard processing and information collection in building exploitation period. The analysis shows a persistent need for a deeper BIM design research, to improve information interchange formats that would ensure as much design information saved as possible with ensured feedback. As well as in BIM design, the software packages must be improved by supplementing them with deficient tools or programme codes. After the research of BIM design software, it was determined that architectural, constructional and MEP programs work best interdependently and get analysed the most. These programs work best as they make the least number of mistakes when the model is created in one setting and has many tools. This type of design software data is kept internally, and they are converted into IFC or other information interchange format. Without changing the format, the data is not lost, and this is the reason behind fluent information interchange.
Issue date (year)
2018
URI
https://etalpykla.vilniustech.lt/handle/123456789/125241
Collections
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources [7946]

 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjects / KeywordsInstitutionFacultyDepartment / InstituteTypeSourcePublisherType (PDB/ETD)Research fieldStudy directionVILNIUS TECH research priorities and topicsLithuanian intelligent specializationThis CollectionBy Issue DateAuthorsTitlesSubjects / KeywordsInstitutionFacultyDepartment / InstituteTypeSourcePublisherType (PDB/ETD)Research fieldStudy directionVILNIUS TECH research priorities and topicsLithuanian intelligent specialization

My Account

LoginRegister