Show simple item record

dc.contributor.authorVaikasas, Saulius
dc.contributor.authorPalaima, Kęstutis
dc.contributor.authorSabas, Gintautas
dc.date.accessioned2023-09-18T19:09:59Z
dc.date.available2023-09-18T19:09:59Z
dc.date.issued2011
dc.identifier.other(BIS)VGT02-000024790
dc.identifier.urihttps://etalpykla.vilniustech.lt/handle/123456789/136304
dc.description.abstractInteraction between a river and its environment is crucial, and negative impact of a HPP operation on the environment must be estimated. In order to be able to evaluate this impact, hydraulic parameters such as velocity, water depth, Froude Number (Fr) and fluctuation of flow regimes have been measured and hydro biological indices of water quality (HBI) have been calculated. Field experiment on the consequences of HPP turbines’ operation in the rivers Virvyte and the Susve has been performed in natural, directly and indirectly impacted regimes in 10 cross-sections. To predict the influence of HPP, the meaning of Fr number criterion and the number of hydrophytes are compared. The results show that even small dams and reservoirs of HPP may impact the environmental change through facility operations over a sustained period, because in pounded reaches nearby/above HPP dams in the River Virvyte low Fr number in habitats (0.04>Fr> 0.0007) has been established. In the River Susve, below the Angiriai HPP, a serious disturbance of hydraulic parameters is determined when a positive wave front resulting from an increase of initial sanitary flow rate Qs =0.4m3 /s to total flow rate Qtot =10.4 m3 /s is moving downstream after the switching on the turbines. The maximal water level increase speed Δh /Δt( 0.18 m/min=10.8 m/h) is recorded on the second minute from start of the turbine. Consequently, it creates additional pressure of about 200kPa at the instant and can be a strong stressor for biological community of the river. Over 1 km long propagation of the surge without loosing much potential energy (because it is perpetual) is the main reason to avoid rapid operation of HPP turbines in practice.eng
dc.format.extentp. 692–697.
dc.format.mediumtekstas / txt
dc.language.isoeng
dc.relation.isreferencedbyConference Proceedings Citation Index (nenaudotinas)
dc.source.urihttp://leidykla.vgtu.lt/conferences/Enviro2011/Articles/2/692-697_Vaikasas_other.pdf
dc.titleHydraulic criteria and estimation of the hydropower plant (HPP) operation impact on the river environment
dc.typeStraipsnis recenzuotame konferencijos darbų leidinyje / Paper published in peer-reviewed conference publication
dcterms.references18
dc.type.pubtypeP1d - Straipsnis recenzuotame konferencijos darbų leidinyje / Article published in peer-reviewed conference proceedings
dc.contributor.institutionVilniaus Gedimino technikos universitetas Lietuvos žemės ūkio universiteto Vandens ūkio institutas Aleksandro Stulginskio universitetas
dc.contributor.institutionAleksandro Stulginskio universitetas
dc.contributor.institutionVilniaus Gedimino technikos universitetas
dc.contributor.facultyAplinkos inžinerijos fakultetas / Faculty of Environmental Engineering
dc.contributor.facultyNuotolinių studijų centras / Distance Learning Centre
dc.subject.researchfieldT 004 - Aplinkos inžinerija / Environmental engineering
dc.subject.enHydraulics
dc.subject.enHydropower plant
dc.subject.enEnvironment
dc.subject.enFr Number
dcterms.sourcetitle8th International Conference "Environmental Engineering", May 19-20, 2011, Vilnius, Lithuania CD
dc.publisher.nameTechnika
dc.publisher.cityVilnius
dc.identifier.doiLZU02-000026178
dc.identifier.elaba3986419


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record