dc.description.abstractThe paper describes the estimating settlements of bored piles foundation on the site of the Elektrenai power plant, Lithuania. The bored piles foundation supports equipment of the power plant consisting of the gas turbine, the steam turbine and the generator. The piling solution was adopted for the following reasons: i) the insufficient capacity of the soil to support great stresses over it; ii) high requirements of slab settlements and bearing capacity with regard to the main equipment in power plant.). For settlement calculation five methods were employed, such as Bowles [1] and Schmertmann methods [2] and [3], the method described in EN 1997-2 [4], [5] and [6] and NEN 6743 [7], and finite element method applied in Plaxis 3D Foundation package. The results obtained by applying these methods where compared with experimental results on construction site. The experiment results were acquired from static load test of one test pile and four reaction piles. Piled foundation was evaluated through immediate settlement analysis and included analysis of the soil data from cone and dynamic penetration tests, boreholes and laboratory tests. Soil properties were estimated from site investigation of the Elektrenai power plant and soil exploration program according to Lithuanian standards. Pile settlement analysis showed that settlement value was 13.5 mm (pile toe settlement), and settlement value of elastic deformation of pile from vertical compressive loads was 2.1 mm, for the most conservative situation. For such structure, foundation settlement should not exceed 16 mm. Because the Elektrenai power plant has high reliability requirements, piles diameter of 880 mm and 29 m long were finally carried out to endure overall loads.eng
dc.formatPDF
dc.format.extentp. 287-293
dc.format.mediumtekstas / txt
dc.language.isoeng
dc.relation.isreferencedbyScienceDirect
dc.relation.isreferencedbyConference Proceedings Citation Index - Science (Web of Science)
dc.source.urihttp://www.sciencedirect.com/science/article/pii/S1877705813007698
dc.titleEstimation of settlements of bored piles foundation
dc.typeStraipsnis konferencijos darbų leidinyje Web of Science DB / Paper in conference publication in Web of Science DB
dcterms.references13
dc.type.pubtypeP1a - Straipsnis konferencijos darbų leidinyje Web of Science DB / Article in conference proceedings Web of Science DB
dc.contributor.institutionVilniaus Gedimino technikos universitetas
dc.contributor.facultyStatybos fakultetas / Faculty of Civil Engineering
dc.subject.researchfieldT 002 - Statybos inžinerija / Construction and engineering
dc.subject.enBored pile
dc.subject.enPile foundation
dc.subject.enPile settlement analysis
dc.subject.enPile CPT
dc.subject.enPlaxis 3D Foundation
dc.subject.enGEO5
dcterms.sourcetitleProcedia Engineering. 11th international conference on modern building materials, structures and techniques (MBMST), May 16-17, 2013, Vilnius, Lithuania
dc.description.volumeVol. 57
dc.publisher.nameElsevier
dc.publisher.cityAmsterdam
dc.identifier.doi000323486600036
dc.identifier.doi10.1016/j.proeng.2013.04.039
dc.identifier.elaba4024848


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record