• Lietuvių
    • English
  • Lietuvių 
    • Lietuvių
    • English
  • Prisijungti
Peržiūrėti įrašą 
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • Peržiūrėti įrašą
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • Peržiūrėti įrašą
JavaScript is disabled for your browser. Some features of this site may not work without it.

Multi-criteria analysis of Projects' performance in construction

Thumbnail
Data
2014
Autorius
Zavadskas, Edmundas Kazimieras
Vilutienė, Tatjana
Turskis, Zenonas
Šaparauskas, Jonas
Metaduomenys
Rodyti detalų aprašą
Santrauka
Construction companies usually perform several construction projects at the same time. Projects differ by complexity, duration, budget, variety of works, and number of implementers. Also vary the results of the projects: some of them have been implemented successfully, other terminated with losses or accidents. To determine the causes of one or another result the analysis of project work flow indicators should be performed. The evaluation of project indicators during implementation is not easy task due to the lack of up to date data and indicators measuring problem. The purpose of the research was to analyze common project management problems, the success factors of construction projects and to illustrate how to assess a projects' execution efficiency by mean of the aggregated indicator in particular company. In case study the problem of project performance indicators selection was analyzed, the aggregated project's performance criterion was determined by applying the methods of multi-criteria analysis and logarithmic normalization method was applied. Results show that by using the aggregated indicators it is easy to compare the projects, the received impartial information is useful for strategic planning, quality management, for solving the tasks of resource allocation, motivational project evaluation.
Paskelbimo data (metai)
2014
URI
https://etalpykla.vilniustech.lt/handle/123456789/145467
Kolekcijos
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources [7946]

 

 

Naršyti

Visame DSpaceRinkiniai ir kolekcijosPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijosŠi kolekcijaPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijos

Asmeninė paskyra

PrisijungtiRegistruotis