• Lietuvių
    • English
  • Lietuvių 
    • Lietuvių
    • English
  • Prisijungti
Peržiūrėti įrašą 
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai kituose recenzuojamuose leidiniuose / Articles in other peer-reviewed sources
  • Peržiūrėti įrašą
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai kituose recenzuojamuose leidiniuose / Articles in other peer-reviewed sources
  • Peržiūrėti įrašą
JavaScript is disabled for your browser. Some features of this site may not work without it.

Keturių dimensijų modelio efektyvumo vertinimo teorinis aspektas

Thumbnail
Peržiūrėti/Atidaryti
ARTIC_0_01.pdf (71.89Kb)
Data
2012
Autorius
Reizgevičius, Marius
Reizgevičienė, Rasa
Metaduomenys
Rodyti detalų aprašą
Santrauka
Projektuotojai, užsiimantys ypač sudėtingų objektų statyba, pvz., mega aukštų pastatų, neįsivaizduoja, kiek truktų statyba, jei projektavimui būtų naudojami tik 2D brėžiniai. 4D taikymas statybos procesuose leidžia pasiekti tiek alokacinį, tiek technologinį efektyvumą. Projektuojant pastatus trimatėje erdvėje, negaištama papildomo laiko pjūviams ir fasadams sudaryti. Šiuolaikinės projektavimo programos tai padaro vieno klavišo paspaudimu. Medžiagų kiekiai, darbo jėgos poreikis, mechanizmai įtraukiami į žiniaraščius automatiškai, taip išvengiama klaidų ir neatitikimų objekto ekonominėje dalyje. Galima stebėti prognozuojamą statybos eigą, pavyzdžiui, kaip statomas objektas atrodys po pusės metų. Mažesnė tikimybė statyboje padaryti klaidų, kurių taisymas didintų laiko ir finansines sąnaudas. Automatinis darbo grafikų sudarymas įgalina nuosekliai planuoti įmonės darbuotojų pajėgumus, statybas. 4D taikymas padeda pasiekti vidutiniškai 7 proc. didesnį statybos objekto išbaigtumą nei naudojant 2D modelį (esant vienodam statybos laiko limitui). 4D reikalauja 12 proc. retesnės prieigos prie statybos projekto informacijos nei naudojant 2D modelį. Keturių dimensijų modelis statybos procese klaidų tikimybę sumažina 40 proc., padeda vidutiniškai 7 proc. sutrumpinti statybos proceso trukmę, vidutiniškai 14 proc. pagerina statybos proceso suvokimą (visose statybos proceso grandyse), vidutiniškai 8 proc. sumažina laiko sąnaudas projekto brėžinių skaitymui ir 67 proc. sumažina laiko sąnaudas statybos klaidoms taisyti, lyginant su dviejų dimensijų modelio naudojimu.
 
Architects and engineers involved in the construction of particularly complex objects, such as mega-tall buildings, have no idea how many 2D CAD drawings it would take for them to produce the full picture of the construction design. The use of 4D CAD model in construction process helps to achieve both allocational and technological efficiency. The designing of buildings in three dimensions eliminates waste of time for drawings of sections and facades. With a modern design program this task can be accomplished in a single keystroke. Quantities of materials, labour demand, and mechanisms are included in the sheets automatically, thus mistakes and inconsistencies in the economic part of the object are avoited. It is easy to monitor the planned progress of construction process, for example, to see how the construction in progress will look after half a year. It reduced likelihood of mistakes in construction, the correction of which would increase time and costs required. Automatic job scheduling allows consistent planning of the capacity of employees and the construction. Compared to 2D CAD, 4D CAD gives on average 7% greater completion of the object being constructed (when the time limit for construction is the same). Compared to 2D model, the 4D model requires 12 % rarer access to building project information. When using the four-dimensional model in the process of construction, probability of mistakes decreases by 40 %. It has been found that use of the 4D model helps to shorten the duration of the construction process on average by 7 %. It also improves understanding of the construction process on average by 14 % (in all segments of the construction process chain), decreases the time needed to read drafts of the project on average by 8 %, and shrinks time spent on corrections of construction mistakes by 67 %, compared with the use of a two-dimensional model.
 
Paskelbimo data (metai)
2012
URI
https://etalpykla.vilniustech.lt/handle/123456789/149558
Kolekcijos
  • Straipsniai kituose recenzuojamuose leidiniuose / Articles in other peer-reviewed sources [8559]

 

 

Naršyti

Visame DSpaceRinkiniai ir kolekcijosPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijosŠi kolekcijaPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijos

Asmeninė paskyra

PrisijungtiRegistruotis