• Lietuvių
    • English
  • English 
    • Lietuvių
    • English
  • Login
View Item 
  •   DSpace Home
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • View Item
  •   DSpace Home
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

A soft computing approach based on critical chain for project planning and control in real-world applications with interval data

Thumbnail
Date
2021
Author
Aramesh, S.
Mousavi, S. M.
Mohagheghi, V.
Zavadskas, Edmundas Kazimieras
Antuchevičienė, Jurgita
Metadata
Show full item record
Abstract
Resource-constrained project scheduling problem (RCPSP) has been one of the most important topics in project scheduling in recent decades. RCPSP, due to the strategic importance of the projects and internal and external pressures for timely completion, is a very challenging task. When executing a project, controlling and monitoring it also becomes vital. This paper aims to present a new soft computing framework that incorporates decision making about RCPSP parameters, RCPSP modeling, adding project and activities buffer, and monitoring the project. In the decision-making procedure, the activities durations are interval, but resource requirements are real numbers. So, the decision-making problem needs a hybrid procedure. To overcome this matter, the hybrid projection measure is extended to obtain the experts weights and build the aggregated decision matrix. In the RCPSP section, the activities durations are not determined and vary between certain ranges. The resource requirements and range of activities durations are obtained from group decision-making method. In addition, this model is solved with simulated annealing (SA) algorithm. In the third step, buffers are considered in a way that allocating project buffer to activities’ buffers becomes based on a new normalized important factor. The normalized important factor is introduced by considering activity duration and resource requirements. Finally, a novel controlling procedure is extended by activity buffer monitoring. Two buffer threshold sets and violations are applied, and each one of them sends a particular alarm to the project manager. Project manager's decisions in optimistic and pessimistic situations are discussed. Ultimately, the method is solved in a real case study, and the results are discussed. The application shows that the presented method is flexible in many situations. It also increases the probability of timely completion of the project in addition to tracking the deviations from the plan. The proposed method introduces a comprehensive framework, so it gives project managers a better vision. It can also act as an ideal monitoring tool to control schedule deviations and to help project manager for proper actions during the project execution.
Issue date (year)
2021
URI
https://etalpykla.vilniustech.lt/handle/123456789/151061
Collections
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources [7946]

 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjects / KeywordsInstitutionFacultyDepartment / InstituteTypeSourcePublisherType (PDB/ETD)Research fieldStudy directionVILNIUS TECH research priorities and topicsLithuanian intelligent specializationThis CollectionBy Issue DateAuthorsTitlesSubjects / KeywordsInstitutionFacultyDepartment / InstituteTypeSourcePublisherType (PDB/ETD)Research fieldStudy directionVILNIUS TECH research priorities and topicsLithuanian intelligent specialization

My Account

LoginRegister