• Lietuvių
    • English
  • Lietuvių 
    • Lietuvių
    • English
  • Prisijungti
Peržiūrėti įrašą 
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Konferencijų publikacijos / Conference Publications
  • Konferencijų straipsniai / Conference Articles
  • Peržiūrėti įrašą
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Konferencijų publikacijos / Conference Publications
  • Konferencijų straipsniai / Conference Articles
  • Peržiūrėti įrašą
JavaScript is disabled for your browser. Some features of this site may not work without it.

Feasibility study of express railway line construction in Lithuania

Thumbnail
Data
2005
Autorius
Lingaitis, Leonas Povilas
Butkevičius, Jonas
Metaduomenys
Rodyti detalų aprašą
Santrauka
When Lithuania became a member-state of the European Union, the problems of railway development and their integration into the European railway network came to the forefront. According to the high-speed railway development plan EURAILSPEED 95, adopted at the VIC II congress in France in 1995, two European express railway lines should be constructed in Lithuania. The first line should link Warsaw – Kaunas – Riga – Tallinn/Helsinki (transport corridor Crete I), while the second should go through Klaipėda – Kaunas – Odessa (transport corridor Crete IX). The priority is given to the first new express railway line Warsaw – Helsinki called RAIL BALTICA, crossing four states – Poland, Lithuania, Latvia and Estonia. This line is aimed for both passenger and freight transportation. The maximum traffic speed can reach 250 km/h for passenger trains and 140 km/h for goods trains. The project RAIL BALTICA is specified as the priority project of infrastructure development by the European Commission. This line should be constructed in three stages. At the first stage, including the period until 2010, the railway line in Poland leading from Warsaw to the frontier with Lithuania (Šeštokai station) should be upgraded and an express railway should be constructed to link it with Kaunas. At the second stage (up to 2014), an express railway from Lithuania to Riga should be constructed, while at the third stage (up to 2016) such a railway should be constructed on the route to Tallinn. Keywords: express railway, freight and passenger transportation, network, transportation market, route, terminal, car.
Paskelbimo data (metai)
2005
URI
https://etalpykla.vilniustech.lt/handle/123456789/140904
Kolekcijos
  • Konferencijų straipsniai / Conference Articles [15192]

 

 

Naršyti

Visame DSpaceRinkiniai ir kolekcijosPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijosŠi kolekcijaPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijos

Asmeninė paskyra

PrisijungtiRegistruotis