• Lietuvių
    • English
  • Lietuvių 
    • Lietuvių
    • English
  • Prisijungti
Peržiūrėti įrašą 
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • Peržiūrėti įrašą
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Moksliniai ir apžvalginiai straipsniai / Research and Review Articles
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources
  • Peržiūrėti įrašą
JavaScript is disabled for your browser. Some features of this site may not work without it.

The modelling of roof installation projects using decision trees and the AHP method

Thumbnail
Peržiūrėti/Atidaryti
sustainability-12-00059-v2.pdf (845.6Kb)
The Modelling of Roof Installation Projects Using Decision Trees and the AHP Method.pdf (845.3Kb)
Data
2020
Autorius
Maceika, Augustinas
Bugajev, Andrej
Šostak, Olga Regina
Metaduomenys
Rodyti detalų aprašą
Santrauka
In this work, the process of roofing projects’ execution is considered. The proper analysis of this process is important to optimise the behaviour of a project’s participants and to perform risk evaluation. The main result of this work is methodology, which can be used to optimise a project owner’s decisions and potentially can be applied for risk control or integrated into expert systems. This methodology includes the application of a decision tree and AHP (analytic hierarchy process) method to perform the modelling for roof installation project selection. In the proposed approach, a decision tree describes the process with nodes representing the states of a project. The tree includes the decision on whether to sell the project results or not, which requires the estimation of the subjective opinion of the project owner. These subjective values are used in the decision tree leaves. We propose to perform this estimation with the AHP method and describe how to do it in this paper. A particular example was considered. The proposed methodology was applied to that case, and all details of the process and results are provided. Using the proposed methodology, the adapted version of a specific, current situation model of project participants’ behaviours can be formed, allowing one to make the most efficient decisions in the light of the existing constraints. The application of results can increase the investor protection and contribute to the general sustainability of investments.
Paskelbimo data (metai)
2020
URI
https://etalpykla.vilniustech.lt/handle/123456789/148593
Kolekcijos
  • Straipsniai Web of Science ir/ar Scopus referuojamuose leidiniuose / Articles in Web of Science and/or Scopus indexed sources [7946]

 

 

Naršyti

Visame DSpaceRinkiniai ir kolekcijosPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijosŠi kolekcijaPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijos

Asmeninė paskyra

PrisijungtiRegistruotis