    • Lower-level decision task solution while optimising a construction project schedule 

      Dytczaka, Mirosław; Ginda, Grzegorz (Procedia Engineering, 2013)
      A bi-level approach for optimisation of a construction project is discussed in the paper. Considered optimisation problem deals with identification of optimal project and a corresponding optimal schedule. Project structure ...
    • Weather influence-aware robust construction project structure 

      Dytczak, Mirosław; Ginda, Grzegorz; Szklennik, Nina; Wojtkiewicz, Tomasz (Procedia Engineering, 2013)
      Construction projects consist of numerous technological operations. The operations can be usually arranged in a considerable number of alternative ways satisfying induced technological order. Applied arrangement of operations ...