| dc.rights.license | Visos teisės saugomos / All rights reserved | en_US |
| dc.contributor.author | Bureika, Gintautas | |
| dc.date.accessioned | 2026-03-04T13:58:46Z | |
| dc.date.available | 2026-03-04T13:58:46Z | |
| dc.date.issued | 2023 | |
| dc.identifier.isbn | 9783031258626 | en_US |
| dc.identifier.issn | 2523-3440 | en_US |
| dc.identifier.uri | https://etalpykla.vilniustech.lt/handle/123456789/160009 | |
| dc.description.abstract | The problematic of determination of maximum capacity of Lithuanian Railway lines is considered is this article. Maximum capacity considered the largest number of trains that could run over a railway line, during the scheduled time interval. At the same time, the train traffic should be ensured in a strictly perfect, mathematically defined environment, with the trains running permanently and ideally at minimum headway, i.e., keeping time-based distance between two consecutive trains. Current applied calculation methods and the means of Lithuanian train traffic arranging are revised by estimating the railway traffic irregularity due the features of technical equipment: traction vehicles, signalling, automatic, track, catenary, etc. The maximum potential capacities of three problematic lines of Lithuanian Railways are estimated taking into account the type and power of freight locomotives. Considered railway lines are: “Livintai – Gaižiūnai”, “Plungė – Šateikiai” and “Pagėgiai – Tauragė – Viduklė”. Finally, basic conclusions and recommendations are given. | en_US |
| dc.format.extent | 756-764 p. | en_US |
| dc.format.medium | Tekstas / Text | en_US |
| dc.language.iso | en | en_US |
| dc.relation.uri | https://etalpykla.vilniustech.lt/handle/123456789/159378 | en_US |
| dc.source.uri | https://link.springer.com/chapter/10.1007/978-3-031-25863-3_73 | en_US |
| dc.subject | Railway transport | en_US |
| dc.subject | Line capacity | en_US |
| dc.subject | Traffic schedule | en_US |
| dc.subject | Period | en_US |
| dc.subject | Time interval | en_US |
| dc.subject | Consecutive trains | en_US |
| dc.title | Revised Estimation of Public Railway Infrastructure Line Capacity: Lithuanian Case | en_US |
| dc.type | Konferencijos publikacija / Conference paper | en_US |
| dcterms.accrualMethod | Rankinis pateikimas / Manual submission | en_US |
| dcterms.issued | 2023-02-22 | |
| dcterms.references | 10 | en_US |
| dc.description.version | Taip / Yes | en_US |
| dc.contributor.institution | Vilniaus Gedimino technikos universitetas | en_US |
| dc.contributor.institution | Vilnius Gediminas Technical University | en_US |
| dc.contributor.faculty | Transporto inžinerijos fakultetas / Faculty of Transport Engineering | en_US |
| dc.contributor.department | Mobiliųjų mašinų ir geležinkelių transporto katedra / Department of Mobile Machinery and Railway Transport | en_US |
| dc.contributor.department | Transporto ir logistikos kompetencijos centras / Transport and Logistics Competence Centre | en_US |
| dcterms.sourcetitle | Proceedings of the International Conference TRANSBALTICA XIII: Transportation Science and Technology. September 15-16, 2022, Vilnius, Lithuania | en_US |
| dc.identifier.eisbn | 9783031258633 | en_US |
| dc.identifier.eissn | 2523-3459 | en_US |
| dc.publisher.name | Springer | en_US |
| dc.publisher.country | Switzerland | en_US |
| dc.publisher.city | Cham | en_US |
| dc.identifier.doi | https://doi.org/10.1007/978-3-031-25863-3_73 | en_US |