Naršyti 13th Baltic Sea region geotechnical conference. Historical experience and challenges of geotechnical problems in Baltic Sea region pagal temą "construction aspects"
Dabar rodomi įrašai 1-1 iš 1
-
The Case of the New Tagus River Leziria Bridge
(13th Baltic Sea region geotechnical conference. Historical experience and challenges of geotechnical problems in Baltic Sea region, 2016, 2016)A brief description of the New Tagus River Leziria Bridge composed by 1695 m North Viaduct, by 970 m Main Bridge and by South Viaduct with a length of 9200 m is presented. The observed thickness of the foundation alluvia ...
