• Lietuvių
    • English
  • Lietuvių 
    • Lietuvių
    • English
  • Prisijungti
Peržiūrėti įrašą 
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Konferencijų publikacijos / Conference Publications
  • Konferencijų straipsniai / Conference Articles
  • Peržiūrėti įrašą
  •   DSpace pagrindinis
  • Mokslinės publikacijos (PDB) / Scientific publications (PDB)
  • Konferencijų publikacijos / Conference Publications
  • Konferencijų straipsniai / Conference Articles
  • Peržiūrėti įrašą
JavaScript is disabled for your browser. Some features of this site may not work without it.

Hydrogeology model of Ignalina region for Visaginas well field protection zone substantiation

Thumbnail
Data
2011
Autorius
Jakimavičiūtė Maselienė, Vaidotė
Mažeika, Jonas
Petrošius, Rimantas
Skuratovič, Žana
Metaduomenys
Rodyti detalų aprašą
Santrauka
IAEA safety documents (Safety standarts… 1994; 1999a; 1999b) recommend assessing the safety framework of groundwater exploitation in the proximity of nuclear facilities. The main task of this study is to assess the results on the re-calculation of Visaginas town wellfield well protection zones (WPZ), since the Visaginas town wellfield is installed close to Ignalina Nuclear Power Plant (INPP) site and other sites of existing or planed new nuclear facilities. The numerical model used in this study is based on three-dimensional finite-element code FEFLOW 5.0 which allows modeling of groundwater flow and contaminant transport in a layered threedimensional system. The calibrated model of Visaginas wellfield area simulated the groundwater flow in the Quaternary and Upper-Middle Devonian aquifers systems. The evaluation of well protection zones for wellfields exploiting groundwater is currently determined by the Lithuanian legal documents (HN 44:2006). As a result of modeling the groundwater formation sources were specified and dimensions of wells protection zones in sectors 3a and 3b were established. The groundwater modeling results of this study shows that the third sub-zone (3b) of WPZ should be 0.6-1.1 km away from the wellfield fence. The long axis of WPZ extends for 4 250 m from north to south and for approximately 3 250 m from east to west. Visaginas wellfield capture zone during 50 years operation would reach the site for planned near-surface repository for radioactive waste in case of hypothetical very high wellfield capacity more than 70 000 m3/day.
Paskelbimo data (metai)
2011
URI
https://etalpykla.vilniustech.lt/handle/123456789/146672
Kolekcijos
  • Konferencijų straipsniai / Conference Articles [15192]

 

 

Naršyti

Visame DSpaceRinkiniai ir kolekcijosPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijosŠi kolekcijaPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijos

Asmeninė paskyra

PrisijungtiRegistruotis