Supporting of Ecological Safety of Run-off from the Territory of Objects of Road Infrastructure, Contaminated by Petroleum Products
Date
2020Author
Iurchenko, Valentina
Melnikova, Oxana
Mykhailova, Larysa
Lebedeva, Elena
Mikhalevich, Nikolay
Metadata
Show full item recordAbstract
In the experimental studies it was found that open run-off settling in comparison with the close settling systems improves the effect of PP disposal by 1.3 times, hexane fraction of PP – nearby 2 times, separate alkanes C22–C27 – by 2–3 times. Duration of open settling of run-off, formed in the territory of suburban parking areas, shall be 3–10 days. The effect of run-off purification from PP under sedimentation is mainly conditioned by disposing of fraction of nominally complex PP.