• Lietuvių
    • English
  • Lietuvių 
    • Lietuvių
    • English
  • Prisijungti
Peržiūrėti įrašą 
  •   DSpace pagrindinis
  • Universiteto produkcija / University's production
  • Universiteto leidyba / University's Publishing
  • Konferencijų medžiaga / Conference Materials
  • Tarptautinės konferencijos / International Conferences
  • International Conference on Environmental Engineering (ICEE)
  • 8th International Conference “Environmental Engineering” (ICEE-2011)
  • Peržiūrėti įrašą
  •   DSpace pagrindinis
  • Universiteto produkcija / University's production
  • Universiteto leidyba / University's Publishing
  • Konferencijų medžiaga / Conference Materials
  • Tarptautinės konferencijos / International Conferences
  • International Conference on Environmental Engineering (ICEE)
  • 8th International Conference “Environmental Engineering” (ICEE-2011)
  • Peržiūrėti įrašą
JavaScript is disabled for your browser. Some features of this site may not work without it.

Analysis of the information needs for existing buildings for integration in modern BIM-based building information management

Thumbnail
Peržiūrėti/Atidaryti
886_892_Godager_B.pdf (493.4Kb)
Data
2011
Autorius
Godager, Bjørn
Metaduomenys
Rodyti detalų aprašą
Santrauka
The challenge is to decide how to design a building information model (BIM) to support building maintenance and development for existing buildings. Until now the main BIM focus has been related to new projects, and this study focus on different challenges when deciding to use BIM for both new and existing buildings. This paper is based on studies together with regional and hospital authorities, but should be relevant for other types of existing buildings as well. The primary objectives of these studies are to implement requirements for fire safety, universal design, environmental regulations, status of maintenances, occupancy, daily operations, rebuilding, mechanical, electrical, and plumbing installations (MEP) and effective use of energy and space within the BIM model. Additionally, these studies consider what BIM competence is required and by whom. It must also be decided which information is necessary for operating different types of building, and which information must be kept up to date. Successful BIM adoption needs a good implementation strategy, professional guidelines and motivated people in the organisation. This paper explains important options and decisions necessary to establish a BIM for management of existing buildings. Central questions concern the need for competence at different levels in the building owner organisations. At the same time the paper considers how the organisational structures may need to be adjusted.
Paskelbimo data (metai)
2011
Autorius
Godager, Bjørn
URI
https://etalpykla.vilniustech.lt/handle/123456789/160420
Kolekcijos
  • 8th International Conference “Environmental Engineering” (ICEE-2011) [157]

Related items

Showing items related by title, author, creator and subject.

  • Different approaches to building management and maintenance meaning explanation 

    Puķīte, Iveta; Geipele, Ineta (Procedia Engineering, 2017)
    The present paper examines the connection between building and property management and building management system. It provides an insight into the concept of building management. Building management is a particular economic ...
  • Modernization of the register of land and buildings with reference to entering buildings into the real estate cadastre in Poland 

    Buśko, Małgorzata (10th International Conference “Environmental Engineering” (ICEE-2017), 2017)
    Nowadays, it is frequently the case that the database of the real estate cadastre in Poland is not supplied with the record data on buildings. This study presents the issues related to the comprehensive modernization of ...
  • Possibilities for building spatial planning using BIM methodology 

    Peckienė, Aurelija; Ustinovičius, Leonas (Procedia Engineering, 2017)
    The life cycle of a building begins with the planning process. The planning or pre-planning stage is when the most effective decisions are made. Both in terms of time and financial resources, changes made to certain design ...

 

 

Naršyti

Visame DSpaceRinkiniai ir kolekcijosPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijosŠi kolekcijaPagal išleidimo datąAutoriaiAntraštėsTemos / Reikšminiai žodžiai InstitucijaFakultetasKatedra / institutasTipasŠaltinisLeidėjasTipas (PDB/ETD)Mokslo sritisStudijų kryptisVILNIUS TECH mokslinių tyrimų prioritetinės kryptys ir tematikosLietuvos sumanios specializacijos

Asmeninė paskyra

PrisijungtiRegistruotis